How to Start a Radiology & Imaging Centre in India: AERB, PCPNDT, Room Design & Cost (2026)
November 12, 2026How to Start a Day Care Surgery Centre in India: Licences, OT Design, Insurance & Cost (2026)
November 13, 2026How to Start a Dialysis Centre in India: Licences, RO Water, Layout & Cost (2026 Guide)
Few healthcare services are as predictable as haemodialysis. A patient on maintenance dialysis usually needs two or three sessions a week, every week, so a well-run unit fills its chairs on a schedule rather than by chance.
That predictability is earned through design. Treated water, uninterrupted power and strict infection control decide whether a dialysis unit is safe, and they are almost impossible to fix after opening. This guide covers the setup models, approvals, engineering, layout and 2026 costs.
In this guide ▾
- Demand is large and steady: the Health Ministry reports the Pradhan Mantri National Dialysis Programme (PMNDP) running about 1,856 centres with 13,535 machines across 751 districts, and patients need treatment two or three times a week.
- Water is the heart of the unit: plan a double-pass RO plant, a loop with no dead legs and a disinfection log before you choose machines.
- Use the PMNDP checklist as a design benchmark: at least 120 sq ft per haemodialysis bed, a 15A socket and a 3 kVA UPS per machine.
- Separate infected patients: give HBV-positive patients dedicated machines and space, and provide a ventilated reprocessing room if you reuse dialysers.
- A 10-machine unit costs about ₹1–1.6 crore to set up (excluding property). Two shifts a day, six days a week, can serve about 40 regular patients.
Step 1: Pick your setup model
| Model | How it works | Best for |
|---|---|---|
| Standalone dialysis centre | Independent unit with its own nephrologist tie-up and referral network | Entrepreneurs and nephrologists in cities and large towns |
| Hospital-based unit | Run in-house or by a dialysis operator within a hospital | Hospitals adding a high-utilisation service |
| PPP under PMNDP | The private partner provides staff, machines, RO plant, dialysers and consumables. The state provides space, power and water within district hospitals. | Operators with multi-site capability |
Whichever model you choose, decide your payer mix early: self-pay, insurance, PM-JAY or state schemes, and corporate contracts. It determines your pricing, your paperwork and your break-even. Our guide on insurance, TPA and PM-JAY empanelment explains the process.
Step 2: Licences and accreditation
- Clinical establishment registration under the Clinical Establishments Act or your state’s own law. See our CEA registration guide.
- Biomedical waste authorisation from the State Pollution Control Board, plus a CBWTF agreement. Dialysis produces sharps, blood-contaminated waste and used dialysers. See our BMW rules guide.
- Fire safety compliance, trade licence and Shops & Establishments registration as applicable locally.
- Scheme empanelment with PM-JAY, state health schemes, insurers and TPAs, if you plan to treat scheme or insured patients.
- NABH accreditation (optional but valuable). NABH’s Allopathic Clinics programme (2nd edition) includes dialysis centres. Its 40 standards and 174 objective elements cover ten core chapters and three speciality-specific chapters.
Our licensing team files these in parallel, and our quality management team builds NABH-ready SOPs from day one.
Step 3: Water treatment — the critical system
Each haemodialysis session exposes the patient’s blood to a very large volume of dialysate through the dialyser membrane, so water quality is a patient-safety issue, not a utility. A typical treatment train is:
- Pre-treatment: sediment or multimedia filter, softener and activated carbon filter to remove chlorine and chloramine.
- Double-pass reverse osmosis (RO): the PMNDP facility checklist specifies a double-pass system.
- Distribution loop: a continuous loop of medical-grade piping to each station with no dead legs, plus an RO outlet for every machine.
- Monitoring: daily chlorine and conductivity checks, periodic microbiological and endotoxin testing, and routine disinfection of the RO plant and machines, all recorded in a log.
International standards such as the ISO 23500 series for dialysis fluids are the usual reference for water quality targets. Size the RO plant for your future number of machines. The PMNDP checklist also sets a water inflow of 1.3 litres per minute and floor drains at each station.
A short, simple loop is easier to disinfect and less likely to grow biofilm. Place the RO plant room directly beside the dialysis hall, never on a different floor, and leave space to add a second RO train when you expand.
Step 4: Layout and engineering
- Treatment space: the PMNDP checklist asks for at least 120 sq ft per haemodialysis bed, so a 10-station hall needs about 1,200 sq ft of treatment floor before circulation.
- Nurse station: place it centrally with a clear line of sight to every chair, because hypotension and needle dislodgement need an immediate response.
- Isolation: provide a separate room with a dedicated machine for HBV-positive patients, and a segregated area or machines for HCV-positive patients according to your infection-control policy.
- Reprocessing room: if you reuse dialysers, give it exhaust ventilation, a drain and space to store labelled dialysers by patient.
- Power: line voltage of 230V AC (±10%), a 15A socket for each machine and a 3 kVA UPS for each machine (both from the PMNDP checklist), plus DG backup with automatic changeover.
- Patient comfort: sessions run four hours, so provide recliner chairs or beds, TV or Wi-Fi, accessible toilets and a waiting area for attendants.
- Support: a consultation room, consumable store, staff changing room and a BMW holding area with a separate exit.
For the wider principles, see our guide to floor plans for better patient flow, or brief our facility layout team.
Step 5: Equipment and staffing
| Item | Notes |
|---|---|
| Haemodialysis machines | Add at least one standby machine and a dedicated isolation machine |
| Dialysis recliners or beds | Height-adjustable, with Trendelenburg positioning for hypotension |
| RO plant | Double-pass, sized for future expansion |
| Dialyser reprocessing system | If you reuse dialysers, with clear labelling and records |
| Emergency equipment | Crash cart, defibrillator, multipara monitor, suction, oxygen |
| Support equipment | Weighing scale, drug refrigerator, UPS and DG backup |
Team: a nephrologist in charge (on-site or visiting; the PMNDP checklist looks for nephrologist availability), a medical officer during sessions, dialysis technicians and nurses (commonly one per three to four running machines), and housekeeping staff trained in blood-spill handling.
Our equipment procurement team compares machine, consumable and reprocessing costs over five years, not just the purchase price. Our HR mobilisation team recruits and trains dialysis technicians.
Planning a dialysis unit?
Get a station layout, RO and power design and a cost plan for your site.
What does a dialysis centre cost, and how many patients can it serve?
| Setup | Treatment and support area | Indicative capex (excl. property) |
|---|---|---|
| 5 machines | 1,000–1,500 sq ft | ₹55–85 lakh |
| 10 machines | 2,000–2,800 sq ft | ₹1–1.6 crore |
| 15–20 machines | 3,000–4,500 sq ft | ₹1.8–3 crore |
Capacity in simple numbers
10 machines × 2 shifts × 6 days = 120 sessions a week. At three sessions per patient per week, that is about 40 regular patients. A third shift raises capacity to about 60 patients without adding floor area. This is why utilisation, not machine count, drives profitability.
Margins depend on your payer mix and on consumable cost per session (dialyser, bloodlines and concentrates). Model both before you size the unit. See our guides on funding a healthcare project and setting a pricing protocol.
Launch checklist
- Confirm referral demand: nephrologists, hospitals and patients already travelling for dialysis.
- Pick the model (standalone, hospital-based or PPP) and the payer mix.
- Select a site on the ground floor or near a lift, with drop-off, power capacity and water supply. Our site selection team can assess options.
- Design the hall, isolation, RO room and reprocessing room. Finalise electrical and plumbing drawings.
- File clinical establishment registration, BMW authorisation, fire and local approvals.
- Install and validate the RO plant, and complete baseline water testing.
- Install and commission machines, then train staff on SOPs and infection control.
- Apply for scheme and insurer empanelment, and start NABH documentation.
Frequently asked questions
How much does it cost to start a dialysis centre in India?
A 10-machine haemodialysis unit typically costs about Rs 1 to 1.6 crore excluding property, covering machines, the RO plant, fit-out, electrical and UPS. A 5-machine unit can start at about Rs 55 to 85 lakh. Add working capital for consumables and salaries.
How much space is needed per dialysis machine?
The Pradhan Mantri National Dialysis Programme facility checklist asks for a minimum of 120 sq ft per haemodialysis bed. Support areas such as the RO room, isolation, reprocessing, store and waiting area are needed on top of that.
How many patients can one dialysis machine serve?
With two shifts a day for six days a week, one machine provides about 12 sessions a week, enough for roughly four patients on thrice-weekly dialysis. A third shift raises that to about six patients.
Is NABH accreditation available for standalone dialysis centres?
Yes. NABH's Allopathic Clinics programme (2nd edition) includes a dialysis centre programme, and several standalone haemodialysis centres are accredited under it. It is voluntary but helps with insurer and corporate contracts.
Which type of RO plant is needed for dialysis?
Use a double-pass reverse osmosis system with pre-treatment (filtration, softening and carbon) and a continuous distribution loop. Record regular chemical, microbiological and endotoxin tests and disinfection cycles in a log.
Plan your dialysis centre with Hospertz
Station layouts, RO and power engineering, equipment procurement, licensing and staffing: one team from concept to commissioning.