November 13, 2026How to Start a Day Care Surgery Centre in India: Licences, OT Design, Insurance & Cost (2026)
Cataract, hernia, gallbladder, ENT, endoscopy, chemotherapy cycles, dialysis, many orthopaedic and urology procedures: a growing share of surgery in India now finishes the same day. Patients prefer it, surgeons can do more cases per list, and health insurance pays for it.
That makes a dedicated day care surgery centre one of the most capital-efficient ways to build a surgical practice. You get operating theatres and recovery without paying for wards, a 24-hour ICU or a large night-shift team. This guide covers what the law and insurers expect, how to plan the space, and what it costs. If you are weighing a full inpatient hospital instead, read our guide on the cost to start a hospital in India.
In this guide ▾
- Insurance is the business model: IRDAI's standard definition covers day care treatment done under general or local anaesthesia in a hospital or day care centre in under 24 hours, so most procedures you plan are claimable.
- Meet the day care centre definition: registration with the local authority, a qualified doctor in charge, qualified nursing staff, a fully equipped OT of your own and daily patient records.
- Register like any clinical establishment: CEA or state nursing-home registration, biomedical waste authorisation, fire NOC, pharmacy licence and, if you have an X-ray or C-arm, AERB registration.
- Design around throughput: plan 1.5–2 recovery bays per OT and a one-way flow from pre-op to OT to recovery to discharge.
- Indicative 2026 capex for a 2-OT centre is roughly ₹2.5–5 crore excluding property, depending on specialty mix and equipment.
What counts as a day care surgery centre?
A day care (or ambulatory) surgery centre admits a patient, performs a planned procedure under anaesthesia, recovers them and sends them home the same day. It has no overnight wards. Some are standalone; others are a separate day care wing inside a hospital.
For insurance, the definition matters more than the building. Under IRDAI’s standard definitions, day care treatment is a procedure undertaken under general or local anaesthesia in a hospital or day care centre in less than 24 hours because of technological advancement, which would otherwise have needed more than 24 hours of hospitalisation. Routine OPD treatment is excluded.
A day care centre, in the same definitions, must be registered with the local authorities where applicable, be supervised by a registered and qualified medical practitioner, and meet four minimum conditions:
- qualified nursing staff under its employment;
- qualified medical practitioner(s) in charge;
- a fully equipped operation theatre of its own where surgical procedures are carried out;
- daily patient records, made available to the insurer’s authorised representative.
If your centre can’t meet all four, insurers can refuse claims however good your surgeons are. Design the centre against this list from the first drawing.
Step 1: Choose your specialty mix
The specialty mix decides the OT size, equipment and recovery time, so fix it before you look at property.
| Model | Typical procedures | What it needs |
|---|---|---|
| Multi-specialty day surgery | Hernia, laparoscopic cholecystectomy, piles and fistula, varicose veins, ENT, minor orthopaedics | 2–3 general OTs, laparoscopy towers, C-arm |
| Eye day care | Cataract (phaco), glaucoma, pterygium, intravitreal injections | Ophthalmic OT, operating microscope, phaco machine |
| Endoscopy and GI | Diagnostic and therapeutic endoscopy, ERCP (with fluoroscopy) | Endoscopy suites, scope reprocessing room |
| Day care chemotherapy | Chemotherapy and immunotherapy infusions | Infusion chairs, biosafety cabinet for drug mixing |
| Urology and lithotripsy | Cystoscopy, URS, lithotripsy | Urology table, C-arm, laser |
Most successful centres start with two or three specialties where the promoter surgeons already have referral volume, and add others once the OT schedule is full.
Step 2: Licences and registrations
- Clinical establishment registration under the Clinical Establishments Act or your state’s nursing-home law. See our CEA registration guide.
- Biomedical waste authorisation from the State Pollution Control Board and a CBWTF agreement. See our BMW rules guide.
- Fire NOC and fire-safety design to the building’s height and occupancy. See our hospital fire safety guide.
- Pharmacy (drug) licence if you dispense medicines, and a narcotic-drug recognition if you stock controlled analgesics.
- AERB registration for any C-arm or X-ray unit, filed on eLORA with an approved room layout.
- Trade licence, Shops & Establishments registration and lift licence as applicable.
- ROHINI registration with the Insurance Information Bureau, which insurers and TPAs use to identify network providers.
Our licensing and liaisoning team files these as one coordinated set, so a pending fire NOC doesn’t hold up your insurance empanelment.
Step 3: Space planning and OT design
A day care centre is a production line. Patients move in one direction, from arrival to pre-op, the OT, recovery and discharge, and the plan should make that flow obvious.
- OTs: modular OTs of about 350–450 sq ft for general and laparoscopic work, with laminar airflow and HEPA filtration. Eye and endoscopy suites can be smaller.
- Recovery: plan 1.5–2 Stage 1 (PACU) bays per OT, plus Stage 2 recliners where patients sit up, drink and wait for discharge.
- Pre-op: a holding area with changing cubicles and a small assessment room for the anaesthetist.
- Sterile services: a one-way CSSD from dirty to clean, or an outsourcing contract with a nearby hospital.
- Transfer: an ambulance bay and a written transfer agreement with a nearby hospital that has an ICU, in case a patient needs overnight care.
A compact 2-OT centre typically needs 4,000–6,000 sq ft. Ground or first floor with lift access works best, because day patients often arrive on foot and leave groggy.
For theatre detailing, see our OT planning guide. Our facility layout team and civil, MEP and fire team design the OT HVAC, medical gases and power as one system.
Most day care centres are limited by recovery bays, not OTs. If a laparoscopic case needs three hours of recovery and you only have two bays per theatre, your surgeons will wait. Model your case mix and recovery times before you freeze the plan.
Step 4: Get the insurance side right
Revenue in a day care centre depends on cashless claims, so plan empanelment alongside construction:
- Register on ROHINI once you have your establishment registration.
- Apply for empanelment with TPAs and insurers, and negotiate procedure packages. Most insurers check the IRDAI day care centre criteria during their site visit.
- Consider NABH accreditation. NABH’s Small Healthcare Organisation (SHCO) standards suit day care centres, and accreditation strengthens your hand in tariff talks.
- If you plan to serve PM-JAY or state scheme patients, check the scheme’s empanelment criteria for each specialty you offer.
- Train a dedicated insurance desk on pre-authorisation and discharge paperwork. Delayed paperwork is the biggest cause of same-day discharges sliding to the next day.
See our guide to hospital empanelment with insurers, TPAs and PM-JAY.
Planning a day care surgery centre?
Get a space programme, OT and recovery plan and a licensing roadmap for your site.
Step 5: Team and equipment
| Area | Core items |
|---|---|
| OT | Modular OT panels, OT tables, ceiling lights, pendants, anaesthesia workstations, multipara monitors, defibrillator, electrosurgical units |
| Specialty | Laparoscopy towers, C-arm, phaco machine and microscope, endoscopy stack, urology laser (as your mix requires) |
| Recovery | Recovery trolleys, monitors, oxygen and suction at every bay, crash cart |
| Support | Autoclaves or CSSD contract, medical gas manifold, UPS and DG, HIS with insurance module |
Team: anaesthetists on every list, OT and recovery nurses, OT technicians, a medical officer who stays until the last patient is discharged, an insurance coordinator and front-desk staff. Many centres work with visiting surgeons on fixed slots.
Our equipment procurement team and HR mobilisation team handle both.
What does a day care surgery centre cost in 2026?
| Setup | Typical area | Indicative capex (excl. property) |
|---|---|---|
| Single-specialty (eye or endoscopy), 1–2 suites | 2,000–3,500 sq ft | ₹1–2.5 crore |
| Multi-specialty, 2 modular OTs | 4,000–6,000 sq ft | ₹2.5–5 crore |
| Multi-specialty, 3–4 OTs with C-arm and laparoscopy | 7,000–10,000 sq ft | ₹5–9 crore |
Because there are no wards, a day care centre usually needs less capital per procedure than an inpatient hospital. Utilisation is what makes or breaks it, so agree surgeon slots and a package pricing protocol before launch. For funding options, see how to fund a hospital project in India.
Launch checklist
- Fix your specialty mix, surgeon commitments and target cases per month.
- Shortlist premises with ground or first-floor access, structural capacity for OT HVAC and an ambulance bay. Our site selection team can help.
- Prepare the layout, OT HVAC, gases and fire design.
- Sign a transfer agreement with a nearby hospital that has an ICU.
- File CEA, BMW, fire, pharmacy and AERB approvals.
- Build, then validate the OTs (air changes, particle counts, pressure) before the first case.
- Register on ROHINI and complete TPA and insurer empanelment.
- Run mock lists with the full team, then open.
Frequently asked questions
What is a day care centre as per IRDAI?
Under IRDAI's standard health insurance definitions, a day care centre is an institution set up for day care treatment, registered with the local authorities where applicable and supervised by a registered medical practitioner. It must have qualified nursing staff, a qualified doctor in charge, a fully equipped operation theatre of its own and daily patient records available to the insurer.
Is day care surgery covered by health insurance in India?
Yes. Standard health insurance policies cover day care treatment, meaning procedures done under general or local anaesthesia in less than 24 hours that would earlier have needed longer hospitalisation. The procedure must be done in a hospital or a registered day care centre, and OPD treatment is excluded.
Which licences are needed to open a day care surgery centre?
Typically clinical establishment or nursing-home registration, biomedical waste authorisation, a fire NOC, a pharmacy licence if you dispense medicines, AERB registration for any C-arm or X-ray unit, and trade and Shops and Establishments registrations. For insurance work you also need ROHINI registration and empanelment with insurers and TPAs.
How much does a day care surgery centre cost to set up?
A two-OT multi-specialty day care centre typically costs about Rs 2.5 to 5 crore excluding property in 2026. A single-specialty eye or endoscopy centre can start at about Rs 1 to 2.5 crore, and larger centres with three or four OTs cost Rs 5 to 9 crore.
How many recovery beds does a day care OT need?
A common planning rule is 1.5 to 2 Stage 1 recovery bays per operating theatre, plus Stage 2 recliners for patients who are awake and waiting for discharge. Case mix and anaesthesia type change this, so model it before freezing the layout.
Plan your day care surgery centre with Hospertz
Specialty mix, OT and recovery design, licensing and insurance readiness: from concept to commissioning.
Keep reading
Cost figures are indicative 2026 planning ranges, not quotations. IRDAI definitions, insurer empanelment criteria and state registration rules change from time to time, so check the current versions before you apply. This article is general information, not legal or insurance advice.
Get an OT and recovery plan and a licensing roadmap from our planning team.